Most Valuable Project
The project that created the most value
For projects that went beyond «on time, on budget, in scope» and created real value — for the client, the organisation and the world around.
Ceremony — 6 November 2026, PMI Astana Forum
About the award
The award goes to completed or nearly completed projects that show value creation, alignment with the strategy of the organisation and a wider positive effect beyond it.
Which projects are accepted
- A project carried out in Kazakhstan or by a Kazakhstan organisation, completed between 1 January 2025 and 30 September 2026
- Projects from any industry or sector, including those still in the closing stage
- The entry is submitted by the delivery organisation or the project manager; an organisation may submit several different projects
- Participation is free and PMI membership is not required
What the entry includes
The entry is one filled-in file and its attachments. Download the template, fill it in and attach it in the form below — the form itself asks only for the project name, organisation, your name and contacts.
Download the entry template (Word)
- The filled-in entry template — project passport, answers on value created, proportionality and social effect, and the three questions on the discipline of measurement
- A confirmation letter from the client or beneficiary
- A promo video as a link, optional, and supporting materials — up to three files
The confirmation letter is mandatory: an entry without it is not accepted. Up to one page, with signature and position; its author must represent an organisation outside the applicant's structure. The committee may contact the author to verify the letter.
Criteria and points
| Criterion | Question for assessment | Assessed by | Points |
|---|---|---|---|
| Value created | How large and concrete is the value for the client, beneficiaries and the organisation? | Jury | 50 |
| Proportionality | Does the value convincingly outweigh the effort and resources spent? | Jury | 30 |
| Social effect | Is there an impact beyond the organisation, and was it not attributed after the fact? | Jury | 10 |
| Discipline of measurement | Three «yes» answers in the entry, 5 points each | Organising committee | 15 |
A project scores from 0 to 105 points. The score on each jury criterion is the average of the jurors' marks.
How entries are judged
Completeness check
The organising committee checks the entry and scores the discipline of measurement.
Pre-selection if needed
With more than 15 admitted entries the committee shortlists up to ten by value created.
Independent scoring
Each juror scores all admitted entries through an online form.
The winner
The project with the highest total wins; only finalists and the winner are published.
Submit an entry
The entry is submitted by the delivery organisation or the project manager. The language of the entry is Kazakh, Russian or English.
